Enhancements
- General
- Addition of optional setting to prevent haulers from punching in earlier than 5 minutes before shift start. Requires admin to enable.
- Cost Codes
- Added the ability to associate cost codes at Project/Job level and inherit the selection at shift creation
Added the ability to Edit Cost Code name and description
Trux Materials
Enhancements
- Flexible Loads
- Changed the name of Estimate Start time to Estimate Origin Arrival time
- Modify RED color displayed on loads cards to prevent confusion with errors
Bug Fixes
- Flexible Loads
- The color code is duplicated across multiple assignments when a driver assigns an assignment to another driver and then reassigns it back to themselves.
- Prevent Invalid Actions on Job Details Screen After Stack Changes
- Modify EST calculation for subsequent loads on Complete load event
- Bug filter is getting applied when the driver card is expanded and closed
- When clicking on cycle analysis button then blank space is getting displayed while scrolling dispatch side
- Unintended Schedule updated notification on Next Assignment and second last load Completion
- All dispatch and virtual loads of in progress Hourly assignment should appear at top of the virtual load stack
- Virtual loads are not getting cancelled for system punch out assignments
- API
- Sales order API issues around the shipPhoneType field